Brian Drendel

Fermilab AD/Pbar

Photo Gallery

Below are a collection of Fermilab photo galleries. 

Pbar Photo Gallery Pbar Department Photo Album:  A collection of Antiproton Source photos over the years.

Pbar 95-deg LCW pumps 2008 CUB:  Central Utility Building tour including the Pbar 95° LCW, 55° Chilled Water and Tower Water systems. 

Pbar Wireless 2007 Pbar Networks:  This photo gallery shows the locations of Pbar Network devices for both the controls and general network.

Debuncher Loss Monitors Debuncher BLMs:   This photo gallery shows the locations of all the Debuncher BLMs as of the Fall 2004 shutdown.  This was part of a project that also involved troubleshooting the loss monitor hardware.

Pulling out the AP2 Beam Stop AP2 Collimator Work:   This gallery outlines the AP2 collimator work completed in October/November 2004.

Debuncher Sextupole Inspection Sextupole LCW Inspection:  In September 2004, we examined the LCW joints on the Debuncher and Accumulator Sextupoles in attempt to understand if there was a correlation between the condition of the LCW joints and the onset of LCW leaks.  Pictures were take of each sextupole and each suspect LCW joint.  A grading system was developed to reflect the condition of each joint.  All of this information was compiled into a spreadsheet for future reference.

Fermilab Softball 2000 Fermilab Softball:  In 2000 we put together a team of mostly AD Operators and ex-operators for the Fermilab 14" softball league.  We upset Final Force in the semifinals to take second place in the tournament.